Skip to main content
PARTNERSHIPS · OEM

OEM supply agreements. Multi-year. Application-specific. Price-locked.

GTX structures multi-year precision-mesh and fabricated-component supply for electrolyser integrators, aerospace primes, semiconductor fab and OSAT partners, BWMS system OEMs, and defence systems integrators. Fixed-price and indexed contract options. Qualification-sample turnaround inside five working days.

HOW OEM CONTRACTS ARE STRUCTURED

A three-phase onboarding sequence built around your specification window.

PHASE 01 · QUALIFICATION

Specification lock · sample despatch

Customer drawing and spec received. Non-disclosure executed. Qualification sample despatched within five working days from specification lock. Customer performs first-article evaluation.

PHASE 02 · PILOT

Low-volume production · audit

Pilot lot produced against signed-off specification. Certificate of conformity issued. Optional facility audit at GTX Singapore. Pricing schedule ratified.

PHASE 03 · LONG-FORM CONTRACT

Multi-year supply · governed by Singapore law

Framework supply agreement executed under Singapore law (or mutually-agreed jurisdiction). Rolling annual volume commitments, indexed or fixed pricing, dedicated technical account manager.

WHO WE WORK WITH · EXAMPLES OF BUYER PROFILE

We contract with OEMs across five buyer archetypes.

01

Electrolyser stack integrator

RuO₂-coated NiMesh specified into alkaline and PEM stack designs for utility-scale European, Middle Eastern and Australian hydrogen projects.

02

Aerospace prime

NAS 907-aligned composite-cure tooling and AESA radar substrate supply under NDA into fifth-generation airframe and space-launch programmes.

03

Semiconductor fab / OSAT

Ultra-pure NP1 wire and precision-mesh fixturing for sub-3 nm deposition and 3D chip-packaging workflows. Cleanroom-grade vacuum packaging.

04

BWMS system OEM

PTFE-coated marine mesh cartridges integrated into Type-Approved ballast-water management systems for retrofit-stream deployment.

05

Defence systems integrator

EMI shielding, AESA radar substrate, and EW-pod material into cleared defence programmes under ITAR / Wassenaar supervision.

06

Specialty-chemicals plant

400-mesh nickel for PGM / REE recovery closed-loop integration at refiners and catalyst recyclers.

Open an OEM supply conversation.

Structured intake form